江苏科技信息 ›› 2015, Vol. 32 ›› Issue (24): 62-63.doi: 10.3969/j.issn.1004-7530.2015.24.029

• 论文 • 上一篇    下一篇

水文站生产用房建设工程档案验收前准备工作要点--以苏州水文分局浒墅关为例

唐锡宁, 周宇峰, 王谦   

  1. 江苏省水文水资源勘测局苏州分局,江苏苏州,215000
  • 出版日期:2015-08-25 发布日期:2015-08-25

The Key Points of Preparation Archives of the Construction Project of the Production of the Hydrological Station before being Checked and Accepted:Taking Suzhou Hydrological Bureau Xushuguan Hydrological Station as an Example

Tang Xining, Zhou Yufeng, Wang Qian   

  • Online:2015-08-25 Published:2015-08-25

摘要: 水文站生产用房建设工程档案是水文工程竣工验收的重要内容之一,工程档案是办理工程竣工验收备案及房屋权属证书的重要依据,是全面考核建设成果、工程质量的重要步骤。应严格按照国家、省、市法律法规及主管部门的规定要求做好档案验收。文章以苏州水文分局浒墅关为例,阐述了水文站生产用房建设工程档案验收前准备工作要点。

关键词: 水文工程, 档案验收, 准备工作

Abstract: The archives of the construction project of the production of the hydrological station is one of the important contents of the completion and acceptance of the project.The project files is for the completion of an important basis for acceptance of registration and housing management authority certificate, is an important step in the comprehensive assessment of the building results, the quality of the project should be strictly in accordance with the provisions of the state, provincial and municipal laws and regulations and the competent authorities to do file acceptance.This paper takes Suzhou hydrological bureau Xushuguan hydrological station as an example ,expounds the key points of preparation archives of the construction project of the production of the hydrological station before being checked and accepted.